Drip edges on the eaves any valley liners and all flashing should be installed before the tar paper is laid.
Pitched roof felt instructions.
There are also a range of different ways that it can be applied to the roof.
It not only protects the roof but it also protects the fascia.
It starts with installing solid decking usually plywood or oriented.
Hi guys and welcome to my video.
Insert staples with a hammer stapler 12 inches apart along the top and bottom edges of the felt paper as you roll it out along the roof.
You can use your utility knife to cut a slit in the felt overhang at the very top of the roof and then fold the felt down there and nail securely at regular intervals along the gable.
Roofing felt should be installed from the bottom of the roof in horizontal layers to increase the water shedding ability of the felt.
Stick on the underlayment.
I had to re felt my shed roof so i though i d share with you the process i went through and the materials i used.
How to install felt underlayment for a new roof.
Run the felt 6 inches over ridges and hips from each direction and 6 inches up any adjoining walls.
Chalk lines should be snapped 33 5 8 above the eave line.
Installing a roof is much more than just nailing shingles onto some boards.
15 asphalt saturated felt starting at the eaves and lapping upper courses over lower.
The initial layer of felt should be installed to cover the bottom edge of the decking from edge to edge.
After this lines should be snapped every 34 as you move up the roof.
Step 4 continue rolling out the felt until you reach the roof hip on the other end.
Project step by step 15 roll out the self stick underlayment.
It can also be applied to both flat roofs and also pitched and curved roofs meaning there are many jobs where it is the perfect roofing material.
On roofs with a slope of 4 12 or greater use a single layer of minimum no.
Protect the roof against ice dams and windblown rain with self stick ice and water.
Adjust the bottom of the felt if necessary to keep it flush with the gutter apron.
Then pull off the.
Peel off the bottom backing.
Make sure the underlayment lies smooth before you nail the top edge.
Install roll roofing when the temperature is at least 50 degrees fahrenheit to keep the material from cracking.
Before laying roof felt all rotten decking must be replaced.
Overhang is not required.
Once you ve done this you re done.
Install peel and stick roofing in a similar manner.