The answer is yes you will need a permit.
Permit requirements for solar panels.
Solar panel building permits almost any home addition is going to require building permits and solar panels are no exception.
Usually the permits required are two fold.
Review the following documents for assistance with your permit application.
All solar photovoltaic pv systems require an electrical permit and in some cases a building permit.
Remember that regulations can vary from state to state so it s important that you follow the regulations specific to the state in which you intend to add solar panels to your building.
Prior to the issuance of the building permit an electrical permit must be filed using the building permit number.
These primarily deal with the structural integrity of the existing home that the panels will be installed onto.
Prior to installing solar you ll need to obtain permits from your local government for permission to install.
Permits required your solar panel s will require a building permit and an electrical permit.
Permits for rooftop solar power plants the permitting process for rooftop solar power plants depends on the state in which it is installed the size of the power plant and the sector your building belongs to residential commercial or industrial.
Landmark approval is required before you obtain electrical permits if the structure on which the solar system will be mounted is a designated structure for preservation or is in a district designated for preservation under the provisions of the denver revised municipal code drmc chapter 30.
Checklist for residential photovoltaic systems roof mounted standard electrical diagram template.
Generally you should expect to have to file for an electrical permit a structural or building permit and or a dedicated solar photovoltaic pv permit.
To obtain these you ll often need to provide specifications about your proposed solar equipment and system design.
Engineered drawings addressing roofing attachment additional roof loads orientation on roof and designed criteria in compliance with 2018 international building code the 2018 international residential code and the 2015 international fire code.
First you submit a permit application to a local permitting agency known within government as the enforcing agency while the enforcing agency is considering your application you should contact the local utility provider to request permission to connect the solar installation to the local distribution grid.
Application for solar permits must be accompanied with the following.