Apply low adhesive tape along the panel edges at double flange joints to protect panel finishes from sealant and for a smoother look when the sealant is applied and tape removed.
Nichiha siding installation instructions.
High quality exterior grade 100 acrylic latex paints are recommended.
Nichiha panels bring the look of wood stone brick metal more to your commercial or residential projects with high performance fiber cement.
Walls that are out of plumb for example can negatively impact the installation quality of awp.
Apply astm c920 class 35 min compliant sealant into the expansion joint starting at the bottom and pushing sealant into the gap.
Do not use stain or oil or alkyd based paints on nichiha products.
Next liberally apply polyurethane construction adhesive to both surfaces of the channel and place sill chiseled piece irmly onto the channel ensuring solid contact with the back wall surface of the channel and a seating depth of 7 8.
Do not apply paint when siding is wet.
Find 3 part specifications installation manuals product certifications safet data sheets and more technical documentation in our convenient resource center.
Walls that are out of plumb for example can negatively impact the installation quality of awp.
Nichiha does not warrant or accept liability for.
Nichiha spacer may be used in conjunction with panel attachment hardware if necessary to ensure an even substrate.
Nichiha awp cladding may be installed on.
Nichiha installation guide for ten foot panels vertical 6 pre engineered metal buildings pemb secure 7 16 osb or plywood to structure with the guidance of a structural engineer.
Prior to nichiha installation closely inspect exterior wall substrate and correct any problems.
Begin the installation by placing the first course of shingles flush with the bottom edge of the starter course and securing with the appropriate fastener.
Prior to nichiha installation closely inspect exterior wall substrate and correct any problems.
Metal buildings must be new construction.
Refer to pei per 14088 for wind load data.
Metal r panels must be installed reversed with ridges facing the.
Follow the manufacturer s instructions for use.
Alternatively strike a chalk line 18 above the bottom edge of the starter course and position the top edge of the shingles even with the chalk line.