Any exemptions outlined by this rule will not grant authorization for.
New york city requirements for roof mounted hvac equipment.
A permit to operate an air conditioning and ventilating equipment requires an equipment use permit prior to operation of the machinery.
See administrative code sections 28 105 1 28 105 4 item 6 and 28 105 4 2 1.
An interlocking metal sheet having a minimum installed weather exposure of 3 square feet 279 m 2 per sheet.
Is mounted on or suspended from a roof or a ceiling.
C compliance with code and other laws.
Appliances equipment fans or other components that require service are located within 10 feet 3048 mm of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches 762 mm.
Currently section 3405 01 of the fire department s rules title 3 of the rules of the city of new york allows mobile heating and power generating trailers to operate with a citywide permit and sets forth permit supervision and design and installation requirements.
A fdny inspector will visit the premises annually and perform an inspection prior to permit expiration.
In order to obtain epa certification hvac technicians must take an exam which has 80 multiple choice questions that must be completed within 3 hours.
Each roof mounted package unit combines efficiency performance and comfort.
With a 3 150 ton capacity range and efficiency ratings as high as 17 5 seer york commercial packaged rooftop units in both a c and packaged heat pump models balance minimized installation and operating costs and come smart equipment enabled.
27 105 4 and 1 rcny 101 14 exemptions from permit requirement.
Standard for the installation of air conditioning and ventilation systems.
Most but not all air conditioning systems require this type of permit.
And therefore may be exempt from the permit requirements of the new york city construction codes.
New york epa section 608 certification the environmental protection agency epa requires all hvac technicians that work with refrigerants to be certified.
90 a 1996 as modified.
A partially enclosed rooftop structure used to aesthetically conceal heating ventilating and air conditioning hvac electrical or mechanical equipment from view.
Is mounted on the floor and has a compressor which is 5 horse power or more.
2016 ecc c408 and commissioning rule tbd note.
Commissioning required when permitted heating capacity 600kbtu h and or cooling capacity 480 kbtu h.
Metal roof panel.
The city of new york the new york state energy conservation construction code also regulates the design and construction of heating ventilating and air conditioning systems in new york city.